top of page
Below is a lawn that was replanted in the fall of 2017. Crabgrass pre-emergents were not applied in the spring which led to a crabgrass takeover. Extra Crabgrass treatments were made and the wet summer aided in the recovery.
724-382-8203
Proper Drainage includes multiple legs or runs. Removing all the soil and installing a minimum of 4" corrugated pipe. The stone should goto the top of the trench and no soil should be added. By putting soil over top of the stone, the drain can no longer take in surface water, thus sealing off all drain.
bottom of page